- Precision refrigeration integrated refrigeration unit
Stable and efficient, durable operation, ease of use The unit can be combined with Internet of things technology to realize intelligent management and remote control and improve management efficiency.
- Get A Quote
- Description
- Features
Precision refrigeration integrated refrigeration unit
| Side Embedded Fixed Frequency Monoblock Unit | ||||||
| Model | Voltage | Power | Packaging Size (mm) | Product Weight(kg) | Freezer Room Volume | Cold Room Volume |
| XMJL-YTCN10 | 220V | 220V/50Hz | 670*880*800 | 113 | ≤7m³ | ≤12m³ |
| 220V/60Hz | ||||||
| XMJL-YTCN20 | 220V | 220V/50Hz | 820*1000*1000 | 130 | ≤15m³ | ≤25m³ |
| 220V/60Hz | ||||||
| 380V | 380/50Hz | |||||
| XMJL-YTCN30 | 220V | 220V/50Hz | 1050*1000*1000 | 165 | ≤25m³ | ≤40m³ |
| 220V/60Hz | ||||||
| 380V | 380/50Hz | |||||
| XMJL-YTCN40 | 380V | 380V/50Hz | 1120*1070*1060 | 190 | ≤35m³ | ≤55m³ |
| Side Embedded Frequency Conversion Monoblock Unit | |||||
| Model | Supply Voltage | Packaging Size (mm) | Product Weight(kg) | Freezer Room Volume | Cold Room Volume |
| XMJL-BYTCN10 | 220V/50HZ/60Hz | 670*880*800 | 113 | ≤7m³ | ≤12m³ |
| XMJL-BYTCN20 | 220V/50HZ/60Hz | 820*1000*1000 | 130 | ≤15m³ | ≤25m³ |
| XMJL-BYTCN30 | 220V/50HZ/60Hz | 1050*1000*1000 | 165 | ≤25m³ | ≤40m³ |
| XMJL-BYTCN40 | 220V/50HZ/60Hz | 1120*1070*1060 | 185 | ≤35m³ | ≤55m³ |
| Top Mounted Fixed Frequency Monoblock Unit | |||||
| Model | Supply Voltage | Packaging Size (mm) | Product Weight(kg) | Freezer Room Volume | Cold Room Volume |
| XMJL--YTDN10 | 220V/50Hz | 1000*570*810 | 95 | ≤7m³ | ≤12m³ |
| 220V/60Hz | |||||
| XMJL--YTDN20 | 220V/50Hz | 1240*635*810 | 125 | ≤15m³ | ≤25m³ |
| 220V/50Hz | |||||
| 380/50Hz | |||||
| XMJL--YTDN30 | 220V/50Hz | 1410*670*865 | 150 | ≤25m³ | ≤40m³ |
| 220V/60Hz | |||||
| 380V/50Hz | |||||
Customized Services
FAQ
| Q1: How is the maintenance of the monoblock condensing unit performed? |
| A1: The maintenance of the monoblock condensing unit includes regular cleaning, refrigerant inspection, and equipment servicing. |
| Q2: How long is the installation period of the monoblock condensing unit? |
| A2: The installation period of the monoblock condensing unit is usually relatively short, ranging from a few days to several weeks depending on the size and requirements. |
Contact Us

Related Monoblock Unit















