- Easy Installation Walk In Cool Room For Industrial Cold Room
According to different temperature range, cold room can be divided into 0~+5 ℃ cold room, -18 ℃ freezing room and -35 ℃ quick freezing room.
- Get A Quote
- Description
- Features
Easy Installation Walk In Cool Room For Industrial Cold Room
Product Description
1. According to different temperature range, cold room can be divided into 0~+5℃ cold room, -18℃ freezing room and -35℃ quick freezing room.
2. We have color steel PU panel and stainless steel PU panel for option.
3. Panel thick: 100mm thick for 0~+5℃ cold room, 150mm thick for -18℃ freezing room and -35℃ quick freezing room.
4. It is customized. Please let us know your demand, so we can design a suitable project for you.
| Product Name | Complete Cold Room |
Material | Color steel/aluminum flower/stainless steel |
| Size | Size can be customized, according to site and usage demands |
| Door Type | Swing Door/Sliding Door/Double Door |
| Thickness of panel | 50/75/100/120/150/200MM |
| Refrigeration Type | Air cooled/Water cooled/Evaporation cooled |
| Packing | Carton Package,Wooden Package |
| Warranty Time | 1 years |
Design and Factory
Installing a walk-in cool room for industrial use involves several steps
1. Site Selection: Choose an appropriate location for the cool room, considering factors like accessibility, proximity to the production area, and power supply.
2. Design and Planning: Work with a professional to design the cool room layout, size, and specifications based on your specific industrial needs.
Ensure it complies with local building codes and safety regulations.
3. Insulation and Panel Installation:
- Install insulated panels on the walls and ceiling.
- Seal the joints between panels to prevent air leakage.
4. Temperature and Humidity Control: Set up a thermostat and humidity control system to maintain the desired cold room temperature and humidity levels.
5. Testing and Commissioning: Test the entire system for proper functionality. Check for temperature stability and humidity control.
6. Maintenance and Monitoring:Implement a regular maintenance schedule to keep the cool room in optimal condition.
Use temperature monitoring systems to detect and address issues promptly.
Contact Us


















